A novel approach for optimal replacement threshold and inspection scheme for condition based maintenance

نویسندگانHamid R. Golmakani
نشریهJournal of Quality in Maintenance Engineering
نوع مقالهFull Paper
تاریخ انتشار2020
رتبه نشریهعلمی - پژوهشی
نوع نشریهچاپی
کشور محل چاپبریتانیا

چکیده مقاله

Purpose – The purpose of this paper is the simultaneous determination of optimal replacement threshold and inspection scheme for a system within condition based maintenance (CBM) framework.

Design/methodology/approach - A proportional hazards model (PHM) is used for risk of failure and a Markovian process to model the system covariates. Total expected long-run cost (including replacement, inspection, and downtime costs) is formulated in terms of replacement threshold and inspection scheme. Through an iterative procedure, for all different values of replacement thresholds, their associated optimal inspection scheme is determined using an effective search algorithm. By evaluating the corresponding costs, the optimal replacement threshold and its associated optimal inspection scheme are, then, identified.

Findings – The mathematical formulation, that takes into account all different costs, required for the simultaneous determination of optimal replacement threshold and optimal inspection scheme for an item subjected to CBM using PHM is provided. The proposed approach is compared against classical age policy and one state-of-the-art policy through a numerical example. The results shows that the proposed approach outperforms other comparing policies.

Practical implications – In practical situations where CBM is implemented, inspections and downtime often incur cost. Under such circumstances, findings of this paper can be utilized for the determination of optimal replacement threshold and optimal inspection scheme so that the CBM cost is minimized.

 

Originality/value – In most of the reported researches, it is often assumed that inspections have no cost and/or that the time for replacements (either preventive or at failure) is negligible. In the contrary, in this paper we take all cost factors including inspection costs, replacement time(s), and their associated downtime costs into account in the simultaneous determination of optimal replacement threshold and optimal inspection scheme.

لینک ثابت مقاله