1 | A novel approach for optimal replacement threshold and inspection scheme for condition based maintenance | Hamid R. Golmakani | Journal of Quality in Maintenance Engineering | 2020 |
2 | Non-dominated sorting genetic algorithm-II for locating emergency bases to minimise mean and standard deviation of service time | Hamid R. Golmakani - Mahtab Eskandar | InternationaI Journal of Operational Research | Accepted 2019 |
3 | An Evolutionary Algorithm for Supplier Order Allocation with Fuzzy Parameters Considering Linear and Volume Discount | Mahsa Soufi Neyestani , Fariborz Jolai, Hamid R. Golmakani | Elsevier Journal of Scientia Iranica – Transaction E: Industrial Engineering | 2015-06 |
4 | An Artificial Immune Algorithm for Multiple-route Job Shop Scheduling Problem with Preventive Maintenance Constraints | Hamid R. Golmakani, Ali Namazi | International Journal of Operational Research | 2014 |
5 | Optimal Replacement Policy for Condition-based Maintenance with Non-decreasing Failure Cost and Costly Inspection | Hamid R. Golmakani, Morteza Pouresmaeeli | Journal of Quality in Maintenance Engineering | 2014 |
6 | Multiple Route Job Shop Scheduling Using Particle Swarm Optimization Approach | Hamid R. Golmakani, Ali Reza Birjandi | International Journal of Procurement Management | 2014 |
7 | Optimal Non-Periodic Inspection Scheme for a Multi-Component Repairable System Using A* Search Algorithm | Hamid R. Golmakani, Hamid Moakedi | Computers & Industrial Engineering | 2012-12 |
8 | An Artificial Immune Algorithm for Multiple-route Job Shop Scheduling Problem | Hamid R. Golmakani, Ali Namazi | The International Journal of Advanced Manufacturing Technology | 2012-10 |
9 | Optimal Age-based Inspection Scheme for Condition-based Maintenance using A* search algorithm | Hamid R. Golmakani | InternationaI Journal of Production Research | 2012-02 |
10 | Multiple-route job shop scheduling with fixed periodic and age-dependent preventive maintenance to minimize makespan | Hamid R. Golmakani, Ali Namazi | Journal of Quality in Maintenance Engineering | 2012 |
11 | A Two-phase Algorithm for Multiple-Route Job Shop Scheduling Problem Subject to Makespan | Hamid R. Golmakani, Ali Reza Birjandi | The International Journal of Advanced Manufacturing Technology | 2013-07 |
12 | Optimal Non-Periodic Inspection Scheme for a Multi-Component Repairable System with Failure Interaction Using A* Search Algorithm | Hamid R. Golmakani, Hamid Moakedi | The International Journal of Advanced Manufacturing Technology | 2013-07 |
13 | Multi-objective model for multi-period, multi-products, supplier order allocation under linear discount | Fariborz Jolai, Mahsa Soufi Neyestani , Hamid R. Golmakani | International Journal of Management Science and Engineering Management | 2013-05 |
14 | How to Obtain a Series of Satisfying Portfolios: A Fuzzy Portfolio Management Approach | Hossein Dastkhan, Hamid R. Golmakani , Naser Shams Gharneh | International Journal of Industrial and Systems Engineering | 2013 |
15 | Periodic Inspection Optimization Model for a Two-Component Repairable System with Failure Interaction | Hamid R. Golmakani, Hamid Moakedi | Computers & Industrial Engineering | 2012-11 |
16 | Periodic Inspection Optimization Model for a Multi-Component Repairable System with Failure Interaction | Hamid R. Golmakani, Hamid Moakedi | The International Journal of Advanced Manufacturing Technology | 2012 |
17 | Condition-based Inspection Scheme for Condition-based Maintenance | Hamid R. Golmakani | InternationaI Journal of Production Research | 2011-09 |
18 | A linguistic-based portfolio selection model using weighted max–min operator and hybrid genetic algorithm | Hossein Dastkhan - Naser Shams Gharneh - Hamid R. Golmakani | Expert Systems With Applications | 2011-09 |
19 | Constrained Portfolio Selection using Particle Swarm Optimization | Hamid R. Golmakani, Mehrshad Fazel | Expert Systems With Applications | 2011-07 |
20 | Age-Based Inspection Scheme for Condition-Based Maintenance | Hamid R. Golmakani, Fahimeh Fatahipour | Journal of Quality in Maintenance Engineering | 2011-03 |